Co-processing in association with LafargeHolcim Bangladesh PLC +880 1716 542764 ecoregenservices@gmail.com
Certified waste co-processing & resource recovery
Dumping is not disposal. Zero landfill is.
Track every pickup, weight and certificate, live
In association with LafargeHolcim Bangladesh PLC

Certified waste co-processing & resource recovery

Safe, compliant and permanent destruction of ETP / STP sludge, hazardous and industrial waste through high-temperature cement-kiln co-processing.

Zero-landfill · Audit-ready · Permanent
Live trackingTrack your pickupFrom your gate to the kiln, step by step
~1,450 °CKiln temperature
0 kgSent to landfill
15+Waste streams accepted
01
RecoverValue from waste streams
02
Co-processEnergy & raw-material substitution
03
RegenerateA cleaner, circular future
Cement kiln co-processing facility
Eco ReGen collection truck
14+years of ETP expertise
Who we are

One accountable partner from your gate to the kiln

Eco ReGen Services is the waste disposal and resource recovery concern of Eco Growth Industrial Solutions, based in Uttara, Dhaka. We give waste generators one accountable partner for the safe, legal and permanent disposal of ETP sludge, hazardous and non-hazardous industrial waste.

Through our association with LafargeHolcim Bangladesh PLC, accepted waste is co-processed in a high-temperature cement kiln: a zero-landfill route where organic pollutants are destroyed, energy is recovered and the mineral fraction becomes part of the clinker.

  • Safe, documented disposal of every tonne
  • Cost-effective DoE & buyer compliance
  • Recover value from every waste stream
  • Long-term, transparent partnerships
Why zero-landfill matters

Dumping is not disposal

Across Bangladesh, much industrial sludge and waste still ends up in open dumps and landfills, contaminating soil, groundwater and air, and leaving factories exposed to regulatory and reputational risk.

Open dumping of industrial waste
Open dumping: the problem we exist to end

Risks of landfill & dumping

  • Heavy metals & dyes leach into soil and groundwater
  • Methane, odour and open burning
  • Unsafe exposure for workers & communities
  • DoE penalties and failed buyer audits
  • No proof of disposal: the liability stays with you

The Eco ReGen solution

  • Permanent destruction at ~1,450 °C in a cement kiln
  • Energy and raw-material recovery from waste
  • Nothing returns to landfill, ever
  • Safe, trained and documented handling
  • Certificate and chain-of-custody: liability closed
ETP / STP sludge management

From collection to certified, zero-landfill disposal

ETP sludge carries dyes, heavy metals and residual chemicals. We take full responsibility for it, end to end.

01 Site Assessment & Sampling

Sludge quantity, moisture and storage reviewed on site.

02 Agreement & Documentation

Proforma invoice and formal Sludge Management Service Agreement.

03 Safe Collection & Packing

Trained crew, proper PPE and leak-proof packing.

04 Controlled Transport

Covered vehicles with trip-wise transfer records.

05 Cement-Kiln Co-processing

Destroyed at ~1,450 °C in the LafargeHolcim kiln.

06 Disposal Certificate

Audit-ready proof of final, permanent disposal.

Diverse waste. One certified route.

Waste streams we manage

From ETP sludge to expired medicine, we collect, transport and arrange certified co-processing for solid, semi-solid and liquid wastes, hazardous and non-hazardous.

ETP sludge

Effluent treatment plant sludge from textile, dyeing, washing and other industries.

STP sludge

Sewage treatment sludge from factories, hospitals and housing.

Used oil & hydrocarbon sludge

Waste oil, tank bottoms and oily sludge, used as alternative fuel in the kiln.

Incinerator ash

Bottom and fly ash from incinerators and boilers.

Contaminated wastewater

Selected wastewater streams that cannot be treated on site.

What we need for a quotation

  • Waste type & source process
  • Quantity (one-off or per month)
  • Physical state & packaging
  • SDS / MSDS where available
  • Recent lab report (if any)
  • Site location & access

Not accepted in the kiln

Per international co-processing guidelines: radioactive and explosive waste, asbestos, infectious medical waste, e-waste, whole batteries, mineral acids and unsorted municipal waste. We advise the right alternative route.

Have a waste stream not listed here?

Send us the waste details and SDS. We will assess suitability and advise the right, compliant route.

Ask us
Co-processing partnership

Global standards. Local accountability.

Eco ReGen Services works in association with LafargeHolcim Bangladesh PLC, whose waste-management arm (Geocycle) co-processes waste in its cement kiln, under the Holcim Group's internationally recognised protocols, while we take care of everything from your site to the kiln gate.

  • Gas temperatures up to ~2,000 °C at the flame; material at ~1,450 °C
  • Long gas residence time ensures complete destruction of organics
  • Mineral content and most heavy metals bound into clinker
  • Replaces fossil fuel and raw materials: lower CO₂ footprint
Co-processing in association withLafargeHolcim Bangladesh PLC
0°Cmaterial temperature
~2,000 °C at the flame Long residence time 0 kg to landfill
Guaranteed Compliance

Fully documented disposal in line with Bangladesh DoE requirements and global buyer standards: Higg FEM, ZDHC and corporate ESG.

Complete Destruction

Destroyed at ~1,450 °C with long residence time. No residue ash, no landfill, no future liability.

Responsible Operations

Professional, risk-managed handling that protects people, communities and the environment, and your reputation.

Backed by Eco Growth Industrial Solutions
2020Group founded
ISO9001:2015 certified
50+Industrial clients
30+ETP projects
14+Years of expertise
Every industry. One sustainable partner.

Sectors & clientele

We serve prominent private and public organisations across Bangladesh's key industrial sectors.

Textile & RMG
Dyeing & Washing
Oil & Gas
Pharmaceuticals
Agro-products & Seeds
Pesticides & Agrochemicals
Food & Beverage
Consumer Goods
Plastics & Packaging
Leather & Tannery
Chemicals
Healthcare
Steel & Engineering
Paper & Pulp
Government & Municipal
Our clientele Private industry Multinationals Public-sector enterprises Government agencies Development organisations
Your factory dashboard

Every pickup, weight and certificate. Live.

Each customer factory gets its own login. Request pickups, follow every truck step by step, download disposal certificates and see monthly kilograms for your buyer and DoE audits.

Live pickup trackingRequested, scheduled, picked up, in transit, delivered.
Estimated vs actual weightWeighbridge figures recorded for every trip.
Certificates on demandDisposal certificates and manifests in one place.
Monthly & yearly reportsKilograms disposed, ready for Higg FEM and ZDHC.
Managed risk. Documented proof.

Compliance without compromise

We manage every risk carefully to protect our employees, communities and the environment, and to safeguard our customers' reputation.

Trained crews

PPE, handling and spill-response training for every field team.

Safe packaging

Compatible, leak-proof, labelled containers by waste class.

Controlled transport

Covered vehicles, trip records and chain of custody.

Waste analysis

Sampling and lab checks before acceptance.

Compliance framework we support

Bangladesh Environment Conservation Act, 1995 Environment Conservation Rules, 2023 Department of Environment (DoE) requirements Hazardous waste management rules Higg Facility Environmental Module (FEM) ZDHC Wastewater & Sludge Guidelines Holcim Group co-processing & waste-acceptance protocols Brand / buyer restricted-substance & waste policies
Led by certified professionals

Our leadership holds ISO 14001 Lead Auditor, SAC-approved Higg FEM verifier & trainer, GIZ ETP Master Trainer and C2C assessor credentials, with membership of IWA and BWWA. Eco Growth Industrial Solutions is ISO 9001:2015 certified.

Sustainable today. Resilient tomorrow.

Sustainability at our core

Waste is not the end. It is the beginning of a new resource.

EEnvironmental
  • Zero-landfill waste disposal
  • Protect soil & groundwater
  • Lower-carbon fuel substitution
  • Water reuse & ZLD
SSocial
  • Safe, trained field crews
  • Healthier communities near factories
  • Capacity building & training
  • Fair, ethical practices
GGovernance
  • Transparent agreements
  • Full chain-of-custody records
  • Regulatory compliance
  • Accountable reporting
Contributing to the UN SDGs
6Clean Water & Sanitation
9Industry, Innovation & Infrastructure
12Responsible Consumption & Production
13Climate Action
Questions

Frequently asked questions

Everything factories usually ask before their first pickup.

Still have a question?

Our team answers within one working day.

+880 1716 542764
What is cement-kiln co-processing?

Accepted waste is fed into a cement kiln where gas temperatures reach about 2,000 °C and the material about 1,450 °C. Organic pollutants are completely destroyed, the energy replaces fossil fuel and the mineral part becomes part of the clinker. Nothing is left for landfill.

Who co-processes the waste?

We work in association with LafargeHolcim Bangladesh PLC, whose waste-management arm (Geocycle) co-processes waste in its cement kiln under the Holcim Group's waste-acceptance and co-processing protocols. We take care of everything from your site to the kiln gate.

Which waste do you accept?

ETP and STP sludge, used oil and hydrocarbon sludge, pesticides, selected chemicals, expired raw materials and medicine, off-spec products, contaminated packaging and soil, non-recyclable plastics and tannery waste. See the waste streams page. Final acceptance depends on sampling and analysis.

What is not accepted?

Radioactive and explosive waste, asbestos, infectious medical waste, e-waste, whole batteries, mineral acids and unsorted municipal waste. We advise the right alternative route.

What documents do we receive?

A service agreement and proforma invoice, a transfer manifest and weighbridge record for every trip, and a co-processing / disposal certificate. All of it is also available in your customer portal for DoE, Higg FEM and ZDHC audits.

How is the price calculated?

Per kilogram, based on the waste type, quantity, packaging and location. Send us the waste details and SDS and we will send a clear techno-commercial offer after a site visit and sampling.

All questions
To zero landfill

We are ready to manage your ETP / STP sludge & hazardous waste

Send us the waste type, volume and location. Our team will visit, take samples and send a clear techno-commercial offer.

Eco ReGen collection truck
Chat on WhatsApp Call now